Client: 4C Hotel, IHG

BSE|3D worked with IHG on the 4C Hotel, a luxury 5-star hotel comprising 230 bedrooms, providing multidisciplinary Mechanical, Electrical and IT engineering services.

Working closely with the architect and wider project team, BSE|3D developed and integrated specialist building-services solutions within the hotel’s constrained footprint.

A key element of the project was the Swimming Pool and Spa Ventilation system, where BSE|3D developed a high-efficiency ventilation solution to provide a comfortable and controlled environment while achieving high standards of energy efficiency. The system was carefully integrated within the restricted space available for the aquatic facilities.

Water Body / Facility: Hotel Swimming Pool & Spa

What BSE3D Did: High-Efficiency Pool & Spa Ventilation, HVAC Engineering, Heat Recovery & Compact MEP Coordination.

 

 

For more information on the services BSE 3D provide contact us today.

Hotel In IMG
Hotel In IMG 2

Talk to Our Expert Team

Our expert team of building services consultants are here to help. If you would like to learn more about the range of services we offer, please get in touch for an informal discussion about your needs and requirements.